....The main door had opened straight into the hallway from the freezing wind blowing in from outside the building. This problem ....was conquered by the stirling efforts of Ben, Simon and their young Russian 'slave' Ira between them they built a ....substancial porch with a roof guttering and a snug closed area designed to keep the cold out of the building.The Directors ....and Staff at the Orphanages were totally overwhelmed with them projects we achieved in such a short period of time. It ....was wonderful for.them as unfortunately they have neither the know-how or the money to achieve anything like it.

....At Gdov the clumsy and much-cluttered old kitchen facilities with no hot water (Pic left) was replaced by Colin one of our
... long serving voluteers with a brand new kitchen complete with new stainless steel sink top and matching mixer tap.

....Old bathroom had virtually nothing working was completely transformed with new toilets, new bath with shower
....attachment, newly tiled floor and new washing machine installed