....Top left: One of volunteers David, painting the new toilet ceiling. Top centre: Shows the dated condition of the old toilets. Top ....right: Block-work underway. Bottom left: Existing toilets filled in. Bottom centre: Newly tiled floor and steps and new soil pipe
....run in position. Bottom right: New pans and cisterns installed awaiting new toilet seats petitions.

...Top left: Room prepared by our volunteers to install 3 showers in the girls restroom something they have never had before. Top ...centre: As can be seen construction well underway. Top right: One of our volunteers Paul installing new sinks. Bottom left: Paul ...testing the newly installed water heaters. Bottom Centre: One of the young girls Olga helping with grouting and cleaning in the
.. new shower room. Bottom right: Three of our volunteers Michael, Paul and Gill finishing off the painting and grouting.