left: One of volunteers David, painting the new toilet ceiling.
Top centre: Shows the dated condition of the old toilets.
Top ....right: Block-work
underway. Bottom left: Existing toilets filled in. Bottom
centre: Newly tiled floor and steps and new soil pipe |
||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
...Top
left:
Room prepared by our volunteers to install 3 showers in the girls restroom
something they have never had before. Top ...centre:
As can be seen construction well underway. Top right:
One of our volunteers Paul installing new sinks. Bottom
left: Paul ...testing the newly
installed water heaters. Bottom Centre: One of the young
girls Olga helping with grouting and cleaning in the |
||